*LIMITED PRE ORDERS OPEN NOW THROUGH APRIL 30TH ONLY*
Note: Production will take approximately 4–6 weeks to complete before shipping begins.
MATERIAL & PRODUCTDETAIL:
• 400 GSM
• Acid Wash
• Dropped Shoulders
• Gathered at Cuffs & Waistline
Main Material: 100% Cotton
Embroidery: 100% Polyester
MATERIAL & PRODUCTDETAIL:
• 400 GSM
• Acid Wash
• Dropped Shoulders
• Gathered at Cuffs & Waistline
Main Material: 100% Cotton
Embroidery: 100% Polyester
LONGLASTSTATED © 2025, ALL RIGHTS RESERVED